GTNA “Ural-6000” Gas Turbine Pumping Set for Crude Oil Pumping
The acceptance test of the First Russian Gas Turbine Crude Oil Pumping Set GTNA "Ural-6000" developed by Aviadvigatel OJSC conducted from December 10 to December 15, 2008 was successfully completed. The pumping set is assigned for main pipeline crude oil transportation.
The first two gas turbine sets with the pumps of the RuhrPumpen company (Germany) were delivered to the Customer "Sakhalin-Energy" and are being installed at Booster Station 2 within the scope of Sakhalin-2 Project.
GTNA "Ural-6000" is composed of Aviadvigatel-developed GTU-6PG modified gas turbine with
R-45-01 gearbox.
The crude oil pump of the RuhrPumpen company (Germany)
GTU-6PG gas turbine
GTNA "Ural-6000" gas turbine oil pumping set primary performance data (station conditions)
| Parameter | Maximum Power | Nominal Rating | Minimum Power |
| Pump capacity, m3/h | 2245 | 1424 | 800 |
| Pump head, m | 925 | 1045 | 294 |
| Required shaft pump power, kW | 5392 | 3928 | 650 |
| Pump speed, rpm | 3650 | 3532 | 1886 |
| Power turbine (PT) speed, rpm | 7088 | 6859 | 3663 |
| PT exit gas temperature, ºC | 530 | 500 | 400 |
| PT exit gas flow, kg/f | 29,99 | 29,93 | 16,5 |
| Service life, hr: - to overhaul - assigned | 25 000 100 000 |
Advantages of Perm GTNA "Ural-6000" gas turbine crude oil pumping sets
- high efficiency
- low oil consumption
- high life-time indices
- failsafe starting system
- low maintenance and repair cost within the entire life cycle
- total technological-process automation, ease operation and servicing
- ready-to-operate, minimum costs and prompt commissioning
- environmental measures that ensure the compliance with environmental requirements
Please, see our REFERENCE-LIST for more detailed information about quantity and running time of GTNA "Ural-6000" gas turbine pumping sets in service.