GTES-25P gas turbine generator set rated at 25 MW
Packaged GTES-25P gas turbine generator set is designed to produce and supply power for industrial and domestic consumption.
GTES-25P genset can use associated oil gas as a fuel providing its utilization at oil & gas production and processing sites.
Description
GTES-25P gas turbine generator set is developed by OJSC «Aviadvigatel» on the basis of GTU-25P gas turbine with the PS-90EU-25 engine. This engine is a modification of the high-performance PS-90A aircraft engine, which was the first Russian engine to get international airworthiness certificate and is successfully operated on Tu-204, Tu-214, Il-96-300, Il-76MF aircrafts and on the VIP-airliner of the Russian President - Il-96-300PU.
Gas turbine generator set can be used as the main or stand-by power supply, independently or in parallel with other electric power supply sources. There is a provision of exhaust gas heat recovery in a waste-heat boiler, either hot water or steam.
The genset has got modular construction which is simple and convenient in service. It is equipped by all necessary support systems and accessories.
In GTES-25P design advanced technologies were used as well as rich experience of OJSC Aviadvigatel gained from development and operation of gas turbine engines and generator sets.
Performance specifications (ISO)
| 1. Nominal output at generator terminals, (MW) | 23.0 |
| 2. Thermal capacity at outlet, when the temperature of exhaust gases is 110 oC, GCal/hour | 26.1 |
| 3. Exhaust gas temperature, oÑ | 473 |
| 4. Exhaust gas flow, kg/s | 76.7 |
| 5. Equivalent noise level during operation under, dB | 80 |
| Life, hours: - to overhaul - assigned | 30 000 100 000 |
Fuel:
- natural gas as per GOST 5542 or OST 51.40;
associated petroleum gas, diesel and other fuels as agreed upon with Aviadvigatel OJSC.
Major Benefits:
- minimal production facilities. Construction of additional buildings is not needed.
- minimum of maintenance staff.
- high performance and service life rate.
- completely factory-assembled; minimum cost and duration of installation, commissioning and putting into operation;
- low specific fuel consumption for electric power and heat generation to guarantee low power and heat cost price;
- capability for parallel and auto mode operation for optimization of power safety therefore in the case of emergency power cutoff there is automatic transfer to local load. So the negative consequences of failure are excluded;
- short turn-back period of genset - 3...5 years;
- containerized modules design;
- reliability;
- quick maintenance;
- high efficiency.
- minimal repair and maintenance costs resulting in power and heat generation minimal prime costs.
The quantity of gensets in service, operating time of leader gensets, total running time and reliability ratings are given on REFERENCE LIST page.
Information request
If you've got interested in this product, please, fill in our questionnaire and send it back to us. After that you will get detailed information about the generating set or gas turbine combined heat and power plant with the output you need.
