GTES-25P gas turbine generator set rated at 25 MW

Packaged GTES-25P gas turbine generator set  is designed to produce and supply power for industrial and domestic consumption.

Description

GTES-25P gas turbine generator set is  developed by OJSC «Aviadvigatel» on the basis of GTU-25PER gas turbine with the PS-90EU-25 engine. This  engine is a modification of the high-performance PS-90A aircraft engine, which was the first Russian engine to get international airworthiness certificate and is successfully operated on Tu-204, Tu-214, Il-96-300, Il-76MF aircrafts and on the VIP-airliner of the Russian President - Il-96-300PU.

Gas turbine generator set can be used as the main or stand-by power supply, independently or  in parallel with other electric power supply sources. There is a provision of exhaust gas heat recovery in a waste-heat boiler, either hot water or steam. Natural gas as per GOST 5542 (OST 51.40) or petroleum gas is used as fuel.

The genset has got modular construction which is simple and convenient in service. It is equipped by all necessary support systems and accessories.

In GTES-25P design advanced technologies were used as well as rich experience of OJSC Aviadvigatel gained from development and operation of gas turbine engines and generator sets.

Performance specifications (ISO)

1. Nominal output at generator terminals, (MW)23.0
2. Thermal capacity at outlet, when the temperature of exhaust gases is 110 oC, GCal/hour 26.1
3. Exhaust gas temperature, oÑ 473
4. Exhaust gas flow, kg/s 76.7
5. Equivalent noise level during operation under, dB80

Fuel:

  • natural gas as per GOST 5542 or OST 51.40;
  • other fuel as agreed with Aviadvigatel OJSC  

Major Benefits

  • No high-cost construction and large maintenance staff  are required;
  • Completely factory-assembled; minimum cost and duration of installation, commissioning and putting into operation;
  • Low specific fuel consumption for electric power and heat generation to guarantee low power and heat cost price;
  • All the equipment meet environmental requirements for noise and harmful emission;
  • Capability for parallel and auto mode operation for optimization of power safety therefore in the case of emergency power cutoff there is automatic transfer to local load. So the negative consequences of failure are excluded;
  • Short pay-off period of the genset - 3...5 years;
  • Modular design;
  • Reliability;
  • Quick maintenance;
  • High efficiency.

The quantity of gensets in service, operating time of leader gensets, total running time and reliability ratings are given on  REFERENCE LIST page.

Information request

If you've got interested in this product, please, fill in our questionnaire and send it back to us. After that you will get detailed information about the generating set or gas turbine combined heat and power plant with the output you need.

CONTACT

93, Komsomolski prospect, Perm, 614990, Russia.

AVIADVIGATEL

Deputy General Designer-
Chief Designer
Power-Driven gas turbines
for GTES and facilities of their application
Daniil D.Sulimov
Tel: +7 (342) 245-87-89
Fax: +7 (342) 245-97-77
E-mail: sulimov@avid.ru

Marketing dept.
Deputy Chief Designer
Marketing
Anatoliy E. Kostyuchenko
Tel: +7 (342) 240-97-07
Fax: +7 (342) 245-97-77

Head of Marketing dept.
Sergei B. Mishenin
Òål.: +7 (342) 245-63-89
Fax:  +7 (342) 245-97-77
E-mail: mishenin@avid.ru

Deputy Head of Marketing dept.
Sergei G. Serovaev
Òål.: +7 (342) 245-63-89
Fax: +7 (342) 245-97-77
E-mail: serovaev@avid.ru