GTES-16PA gas turbine generator set rated at 16 MW
In GTES-16PA generator set GTU-16PA gas turbine is used, which is designed on the basis of the aeroderivative PS-90EU-16A engine. This new engine is developed within the scope of cooperation of OJSC "Aviadvigatel" and Pratt & Whitney company (USA).
The main distinguishing feature is a new power turbine with rotation speed rated at 3 000 rpm. The reduced turbine rotation speed allows to drive a generator without matching reduction gearbox and therefore to enhance reliability of gas turbine and to reduce total operational costs.
GTES (gas turbine generator set) can be used as the main or stand-by power supply, independently or in parallel with other electric power supply sources. There is a provision of exhaust gas heat recovery in a waste-heat boiler, either hot water or steam.
GTES genset can use associated oil gas as a fuel providing its utilization at oil & gas production and processing sites.
While designing GTES-16PA genset, Aviadvigatel OJSC implemented advanced technologies and took into account its wide experience accumulated during development and operation of gas turbine engines and generating sets.
GTES-16PA gas-turbine generating set can be operated in simple, cogeneration and combined cycles and at base, semipeak and peak power.
Performance specifications (ISO)
| 1. Nominal output at generator terminals, (MW) | 16.3 |
| 2. Thermal capacity at outlet, when the temperature of exhaust gases is 110 oC, GCal/hour | 19.48 |
| 3. Exhaust gas temperature, oÑ | 481 |
| 4. Exhaust gas flow, kg/s | 56.26 |
| 5. Equivalent noise level during operation under, dB | 80 |
| Life, hours: - to overhaul - assigned | 30 000 100 000 |
- natural gas as per GOST 5542 or OST 51.40;
associated petroleum gas, diesel and other fuels as agreed upon with Aviadvigatel OJSC.
Major Benefits:
- minimal production facilities. Construction of additional buildings is not needed.
- minimum of maintenance staff.
- high performance and service life rate.
- completely factory-assembled; minimum cost and duration of installation, commissioning and putting into operation;
- low specific fuel consumption for electric power and heat generation to guarantee low power and heat cost price;
- capability for parallel and auto mode operation for optimization of power safety therefore in the case of emergency power cutoff there is automatic transfer to local load. So the negative consequences of failure are excluded;
- the lowest generated power fuel consumption per 1 kW/h comparing with competitors in this power range; that is very important in the coarse of fuel gas prices inevitably rise;
- short turn-back period of genset - 3...5 years;
- containerized modular design;
- reliability;
- quick maintenance;
- high efficiency.
- minimal repair and maintenance costs resulting in power and heat generation minimal prime costs.
The quantity of gensets in service, operating time of leader gensets, total running time and reliability ratings are given on REFERENCE LIST page.
Information request
If you've got interested in this product, please, fill in our questionnaire and send it back to us. After that you will get detailed information about the generating set or gas turbine combined heat and power plant with the output you need.
