GTU-2.5P gas turbine rated at 2.5 MW

Designed to drive the generator of mobile, packaged and stationary generator sets. Application of these units for drives of pumps, compressors, etc. is also possible.

GTU-2,5P gas turbine rated at 2.5 MW is used in Ural-2500 packaged gensets and for modernization of PÀES-2500 and EG-2500 mobile power plants.

Description

GTU-2,5P has been designed on the basis of  the D-30 aero-engine of the third series, one of the most reliable engines in the history of world aviation.

GTU-2,5P and GTU-4P  are the only gas turbine in Russia rated at 2.5 and 4 MW that have ecological certificates of conformity of the Russian Federation State Committee On Environment Protection.

 

Primary parameters
ISO conditions, fuel efficiency Hu=11958 kcal/kg 
Power turbine shaft output, MW2.68
Power turbine shaft efficiency, %22.1
Power at generator terminals, MW2.55
Efficiency at generator terminals, %21.1
Compressor pressure ratio, πc5.9
Power turbine exit gas temperature (at exhaust), °C361
Power turbine exit gas flow (at exhaust), kg/s25.6
Power turbine rotor speed, rpm5500
Heat power at exhaust, when exhaust gases temperature reduces to 110 oC, Gcal/hr (without fuel re-burn)5.82
Total efficiency (electric + thermal), %76.9
Life, hours:
- to overhaul
- assigned

35 000
100 000

Fuel:
- natural gas as per GOST 5542 or OST 51.40;
- other fuel as agreed with "Aviadvigatel" OJSC

The experience of GTU-2,5P gas turbine operation

As of the beginning of January, 2009 such companies as "Gaspromtransgasyugorsk", "Gaspromdobychanadym", "Burenergo", "Gaspromtransgasuhta", "Gaspromdobychayamburg", OJSC "YUG"  operate 93 power stations PAES-2500M,   modernized by Perm GTU-2,5P, 9 modernized power stations EG-2500M, 30 gas turbine generator sets  "URAL - 2500", rated 2,5 MW.

The operating time accumulated by the whole number of GTU-2,5P gas turbines for 2008 is 205 282 hours.
The total operating time of GTU-2,5P  from the beginning of operation is 2 361 958 hours.
The high-time GTU 2,5P has accumulated 67 074 operating hours.

According to its technical condition the time between overhauls of GTU 2,5P has been prolonged up to 40% from 25 000 to 35 000 hours at "Gaspromtransgasyugorsk" and "Nadymgaspromdobycha", which proves reliability of Perm gas turbines.

Please, see our REFERENCE LIST for more detailed field data.

Information request

If you need information on the cost pf a specific project, please fill in the questionnaire and send it back to us. Then the detailed data on required capacity power plant or gas turbine CHP-plant will be available to you.

Contact

93, Komsomolski prospect, Perm, 614990, Russia.

Mikhail A. Ignatiev
Perm Engine Company
Deputy Commercial Director-
Director Industrial Gas Turbines Program
Tel: +7 (342) 2409-444
Fax: +7 (342) 240-92-47
E-mail: mai@jetmotors.perm.ru

Daniil D.Sulimov
Aviadvigatel
Deputy General Designer-
Chief Designer
Power-Driven gas turbines
for GTES and facilities of their application
Tel: +7 (342) 245-87-89
Fax: +7 (342) 245-97-77
Email: sulimov@avid.ru

Sergei B. Mishenin
Aviadvigatel
Head of Marketing dept.
Tel: +7 (342) 245-63-89
Fax: +7 (342) 245-97-77
E-mail: mishenin@avid.ru

Konstantin V. Mikhaliov
Perm Engine Company
Head of Marketing dept.
Industrial GTU
Tel.: +7 (342) 240-91-94
Fax: +7 (342) 240-92-34
E-mail: mih-kv@pmz.ru