From the beginning of serial production to January 1, 2009 Perm engine-builders manufactured and delivered to the customers more than 492 gas turbines and power plants with capacities ranging from 2.5 to 25 MW.

Counting from the commencement of operation to January 1, 2009 the accumulated total operation time of Perm-built gas turbines and power plants working at power facilities and gas transmission plants reached 7 395 123 hours.

Type of gas turbine (GTU)GTU quantity, pcs.Accumulated operation time, hours
Power generationGas transmission
 GTU-2,5P 133 2 351 015 
 GTU-4P/GTU-4PG 35 905 723 7 498
 GTU-6P/GTU-6PG 17 85 909 10 319
 GTU-10P 40  214 328
 GTU-12PG-2/GTU-12P 97 481 296 1 138 823
 GTU-16P 167  2 179 432
 GTU-25P  3  20 780
   Total: 492 3 823 943 3 571 180
OPERATION TIME OF HIGH-TIME GAS TURBINES
Type of gas turbine (GTU)Commencement of operation, yearOperation time, hoursLocation, operator
 POWER GENERATION
 GTU-2,5P 1994  66 602 Sorumskoye Line Production Management (LPM), Gazprom Transgaz Yugorsk Ltd
 GTU-4P 2000 57 592 Severo-Gubkinskoye oil and gas field, Lukoil-Zapadnaya Sibir Ltd
 GTU-6P 2004 23 658 Ivanovo City, TGK-6. Ivanovo Division OJSC
 GTU-12PG-2 2004 32 767 Bittemskaya GTES-36, Surgutneftegaz OJSC
 GAS TRANSMISSION
 GTU-4PG 2005 7 498 Kasimovskoye gas storage management, Gazprom PHG Ltd
 GTU-6PG 2007 6 986 Myldzhinskaya booster station, Tomskgazprom Ltd
 GTU-10P 2003 24 491 DKS-1V booster station, Gazprom Dobycha Yamburg Ltd
 GTU-12P 2004  46 061 KS-42 Fedorovskaya compressor station, Surgutneftegaz OJSC
 GTU-16P 2000 29 245 DKS-5, Gazprom Dobycha Yamburg Ltd
 GTU-25P 2004 12 105 KS Igrinskaya compressor station, Gazprom Transgaz Chaikovsky Ltd